Engineering services / Many clients, their own rules

An engineering service firm works for many clients at once, and each brings its own guidelines, templates and standards. What one client requires, the next one rejects. Experienced people keep track, and they are exactly who is in short supply.
At the same time AI is changing what an engineering office can deliver. Some tasks stay with the engineer because they need experience, judgement and responsibility. On others AI assists and checks along. And some it already takes over entirely: capturing documents, checking against guidelines and standards, drafting reports on a template.
Engera helps you find that split and put it into practice, task by task. Responsibility stays with your engineers, the work gets faster, and you stay ahead of the competition. And what every project teaches stays in the company, even when people leave.
Upload the client's specification, guidelines and list of standards. Engera turns every requirement into a register entry and assigns it to your work packages.
More on the platformPut every requirement and prescribed standard into the register and assign it to our work packages.
Title block, material callouts, tolerances: Engera checks drawings and reports against each client's rules and shows what is missing, with its reasoning.
More on the platformCheck · drawings against client guideline
| ID | Rule | Drawing | Status |
|---|---|---|---|
| REQ-007 | Welds to ISO 2553 | D-2210 Rev. C | Met |
| REQ-015 | Title block per client template | D-2214 Rev. A | Check |
| REQ-021 | Material with 3.1 certificate | — | Missing |
| REQ-030 | Tolerances to ISO 2768-m | D-2210 Rev. C | Met |
Reasoning
D-2214 still uses the old title block. Since Rev. 4 the client's guideline also requires the plant number.
The client sends 38 comments on revision B. An action assigns each to the drawing it concerns, drafts the reply and puts it up for approval.
More on the platformActions
Comment sheet · Rev. B, 38 items
From drawings, calculations and the findings of the check, Engera drafts the report on the client's template, with the source for every statement. Checking and releasing it stays with the engineer.
More on the platformTechnical report: piping level 3
Deviations from the guideline
The pipe routing was changed after comment Comment sheet Rev. B, no. 17 and agreed by mail
RE: Pipe routing level 3. The wall thicknesses in
Wall thicknesses.xlsx meet the requirement, the drawing affected is
D-2210 Rev. C. Still open:
P4711-58.
The open items in pipe design mainly concern
Working for 2 min
Tell us where things get stuck. We listen, and show you in a demo how Engera takes on exactly that task.
Discuss your use case
Your task
Every client has its own drawing rules, and checking them …
Discuss your use caseEngera runs in the EU, and your data never trains models. What you store in Engera stays yours: encrypted, with access controlled at organisation, project and individual level.
Much of it never needs uploading at all. Engera is a layer across your systems, not a replacement for your document management, ERP or PLM. It reads where your data lives and starts processes right inside those systems. Only what belongs in Engera ends up there.
Yes. Every project has its own access. Anyone outside the project cannot see its documents, and your clients' data never trains models.
Yes. A client's guidelines, templates and standards are uploaded once or stored as a skill, and then apply in that client's projects.
Everything that needs experience, judgement and responsibility: design, decisions, release. Engera prepares, checks along and takes over what can be automated reliably. Nothing is written unless you confirm it.
Tell us, and in the demo we show you how Engera takes it on.