ENGERA
InsightsSecurity
Log inBook a demo
InsightsSecurityLog in
ENGERA

Make AI work in engineering projects.

Platform

  • Overview
  • Analyst
  • Actions
  • Editor
  • Planner
  • Documents
  • Wiki
  • Memory
  • Registers
  • Skills
  • Connectors

Industries

  • Machinery
  • Shipbuilding
  • Large projects
  • Engineering services

Implementation

  • Our approach
  • Pilot and rollout
  • Team enablement

Company

  • About
  • Careers
  • Partners
  • Insights
  • Security
  • Platform
  • Industries
  • Implementation
  • Insights
  • Security
  • About
  • Careers
  • Partners
© 2026 EngeraImprintPrivacyStatus
deen

Platform / Planner

A schedule that thinks ahead.

Phases, tasks, milestones and dependencies, as you know them from MS Project. Plus an Analyst that reads the plan and tells you what a slip means for the contract and acceptance.

Book a demo

Pumping station North schedule

CW 10CW 12CW 14CW 16CW 18CW 20CW 22CW 24
Design
Develop concept
Design review
Procurement
Order pumps
Pump delivery
Installation and acceptance
Factory acceptance (FAT)

Late delivery pushes factory acceptance back by 9 working days

The plan in the same project as your documents. Not in a separate file on the side.

Dates live in contracts, minutes and supplier emails. In the Planner they sit next to those sources, so every task can show where its date comes from.

Start from templates for a phase plan, milestone plan or bid plan, or let an action take the dates from your documents into a plan.

What-if in the chat

Ask what two weeks of delivery delay will do. The Analyst recalculates the plan, reads the contract deadlines and shows which dates slip and when a penalty becomes due.

What happens if the pumps arrive two weeks late?

Plan recalculated, 3 passages in the contract read

TaskTodayWith delay
Pump installation12 May+10 WD
Factory acceptance28 May+9 WD
Handover16 June+9 WD

Handover slips past the contract date. The penalty applies from day 3. PDFContract § 11.2

Dates from your documents

Delivery dates from quotes, milestones from the contract: the action “Move dates into a plan” gathers them, each date with its source.

ACT-041 · Action

Bring dates into a plan

Done 4 dates · 48 sec.

Basis

PDFContract Pumping Station North.pdf

PDFQuotation Supplier C.pdf

Added to the plan

  • CW 18Pump deliveryPDFQuotation p. 3
  • 28 MayFactory acceptancePDFContract § 7.1
  • 16 JunCommissioningPDFContract § 9.2
  • 30 JunHandover to the operatorPDFContract § 11.2

From plan to report

Progress, critical path and deviations flow into your status report and presentation, on your templates.

New document

Choose a template

The outline and instructions are ready and remain editable.

Project status report

Project control · 7 sections

Standard library

Risk report

Project control · 5 sections

Standard library

Acceptance record

Quality & acceptance · 8 sections

Standard library
1
2
3

Operating manual

Quality & acceptance · 8 sections

Standard library
Step 1 of 4Acceptance record selectedContinue

What teams use it for

Assess delivery delaysImpact on acceptance and contract in minutes.→Bid planningFrom receiving the tender to submission.→Track construction phasesMilestones from keel laying to handover.→

Works well with

Platform overview
AnalystAsk across all documents and systems, get answers with sources.→RegistersRequirements, risks, open items: lists with a source.→ConnectorsConnect the systems your projects already run on.→

Which task would you
most like to hand off?

Tell us, and in the demo we show you how Engera takes it on.

Book a demoSee Engera in action