ENGERA
InsightsSecurity
Log inBook a demo
InsightsSecurityLog in
ENGERA

Make AI work in engineering projects.

Platform

  • Overview
  • Analyst
  • Actions
  • Editor
  • Planner
  • Documents
  • Wiki
  • Memory
  • Registers
  • Skills
  • Connectors

Industries

  • Machinery
  • Shipbuilding
  • Large projects
  • Engineering services

Implementation

  • Our approach
  • Pilot and rollout
  • Team enablement

Company

  • About
  • Careers
  • Partners
  • Insights
  • Security
  • Platform
  • Industries
  • Implementation
  • Insights
  • Security
  • About
  • Careers
  • Partners
© 2026 EngeraImprintPrivacyStatus
deen

Platform / Registers

Lists that know where their content comes from.

Requirements, risks, deadlines, bills of materials: registers hold what the project has to track. Engera fills them from your documents, every entry with its source.

Book a demo
Requirements
IDRequirementSectionTypeResponsibleCheck
REQ-001Flow rate 120 m³/h§ 4.2FunctionalProcessClear
REQ-002Redundant pumps§ 4.2FunctionalProcessClear
REQ-003Low-noise operation§ 4.6QualityMechanicalUnclear
REQ-004Fault signal to control room§ 5.1InterfaceElectricalClear
REQ-005Protection class IP55§ 5.3DesignElectricalClear
REQ-006Maintenance without shutdown§ 6.2OperationServiceNot testable

Your lists, your fields. Filled from your documents.

A register is a list or a structure with the fields you need. You set it up yourself, for requirements, risks, suppliers or anything else your project keeps in Excel today.

Entries the AI suggests are marked as suggestions, with reasoning and source. Your team confirms or dismisses them.

Extracted from documents

Requirements from the specification, obligations from the contract, risks from minutes: Engera creates the entries and links each to its passage.

ACT-030 · Requirement extraction

Extract requirements

DoneStarted 10:42 · Jonas Hartmann
Task

Extract the technical requirements for the pumping station and retain their source references.

Source sections read12 s
Requirements extracted1 min 18 s
Source references linked9 s
3 requirements found
REQ-001Flow rate of 120 m³/h
REQ-002Redundant pump arrangement
REQ-003Automatic fault reporting

Assessed and linked

Risks in the matrix, requirements on components, open items with owners. When a source changes, you see which entries are affected.

MinutesRisk listContract
Risk assessment
Consequence
5
4
RISK-008
3
RISK-005
RISK-011
2
RISK-003
1
12345
Likelihood
RISK-0088

Late delivery of the controller

The lead time puts the planned commissioning date at risk.

Likelihood
2
Consequence
4
Treatment · Mitigate

Qualify an alternative supplier and secure the delivery date.

Lena WeberOwner

In and out, as you need

Import existing lists from Excel; the AI maps the columns. Export for your requirements management tool or write back through a connector.

Import requirements
File2Map columns3Review4Import

Map columns

A proposal for mapping your columns. Adjust whatever is off.

Column in your fileEngera fieldRe-map with AI
CategoryStructure · Insulation · Compact stationCategory
PriorityMUST · SHOULD · MAYBinding level
MUSSmussSOLLsollKANNkann
Requirement textFree textText
BackContinue to review

What teams use it for

Requirements managementFrom specification to a reviewable matrix.→Risks and open itemsTrack who clarifies what by when.→Deviation list for a bidWhat the tender wants differently from your standard.→

Works well with

Platform overview
ActionsRecurring work as a flow that runs in the background.→DocumentsEvery file read, structured and searchable down to the passage.→ConnectorsConnect the systems your projects already run on.→

Which task would you
most like to hand off?

Tell us, and in the demo we show you how Engera takes it on.

Book a demoSee Engera in action