Shipbuilding / Every ship one of a kind

Shipbuilding means one-off production over years. Owner, yard, class society and flag state all have a say, much of the ship is bought in from suppliers, and construction often starts while the design is still maturing. Changes arrive in the middle of the build, in blocks that are already built or outfitted.
On top of that comes what the industry faces worldwide: experienced designers and skilled workers are retiring, and new fuels call for new designs and for converting existing fleets.
Much of this is checking and comparing documents that already exist: building specification against class rules, offer against enquiry, change against contract, the findings of the last ship against the next. That is what AI takes off your team today. It learns how you work and, step by step, becomes a real member of the project team.
Load the building specification, the class rules and your house guideline. Engera lists every point where they don't agree, with page and paragraph.
More on the platformCheck section 4 of the building specification against the class rules and our house guideline, and list every conflict.
Every offer becomes a row: scope, price, exclusions, delivery. Gaps against the enquiry are flagged before they turn into a change order.
More on the platformOffers · Insulation and outfitting, deck 5
| Bidder | Price | Exclusions | Status |
|---|---|---|---|
| Nordisol | €412,000 | None | Complete |
| Marine Interiors | €386,500 | Fire dampers | Gap |
| Ostsee Ausbau | €398,000 | Scaffolding | Clarify |
| Baltic Outfit | €441,200 | None | Complete |
Reasoning
Offer MI-2291 excludes the fire dampers that section 2.4 of the enquiry requires.
From the inspection note, thickness gauging, photos and the contract, an action drafts the change order: with its contractual basis and a price calculated from the steel quantity and the agreed unit rates.
More on the platformActions
Change order · Frame 112, corrosion
Who supplied the stabilisers on the last ferries, and what went wrong at sea trials? Engera writes it up as a lessons-learned note from your template, with the source for every statement.
More on the platformStabilisers: lessons from NB 114
What happened
At full speed the fin actuators reached 84 °C Temperature log.xlsx, above the supplier's limit
Data sheet FA-200. The cooling change
Change note 0412 was tracked as
NB116-88 and closed after the sea trial of NB 116.
For the next ferries, the supplier
Working for 2 min
Tell us where things get stuck. We listen, and show you in a demo how Engera takes on exactly that task.
Discuss your use case
Your task
Changes to the building specification reach purchasing too late, and then …
Discuss your use caseEngera runs in the EU, and your data never trains models. What you store in Engera stays yours: encrypted, with access controlled at organisation, project and individual level.
Much of it never needs uploading at all. Engera is a layer across your systems, not a replacement for your document management, ERP or PLM. It reads where your data lives and starts processes right inside those systems. Only what belongs in Engera ends up there.
Yes. Class rules, standards and your own guidelines are uploaded like any other document and checked against the building specification. Every finding points to page and paragraph.
Tell us, and in the demo we show you how Engera makes it easier.