Large projects / Low volume, high complexity

A large project is an interplay: trades, disciplines and companies that depend on one another for years. What is decided in electrical design affects civil works, building services and the schedule, and hardly anyone sees all the connections at once.
No single step is the problem. Every experienced team knows how to check a clause, trace a change or agree an interface. What makes it hard is the volume, the number of parties and the scale, so under cost and schedule pressure, work everyone knows should be done is left undone. AI makes exactly that affordable: every clause read, every change traced, every delay played through the schedule.
And it lifts the baseline of every individual. Someone in electrical design understands faster what a change means for civil works or procurement, without first asking three departments.
Upload the tender documents. Engera extracts every requirement and obligation into a register you can assign, filter and track.
More on the platformExtract every obligation and technical requirement into the requirements register and assign each one to a discipline.
Prime contract and subcontracts side by side: for every obligation, whether it was passed down in full, in part or not at all.
More on the platformFlow-down · Prime contract and subcontracts
| ID | Obligation | Subcontract | Status |
|---|---|---|---|
| REQ-012 | Warranty 24 months | SUB-02 § 9 | Passed down |
| REQ-044 | Delay damages | SUB-01 § 12 | In part |
| REQ-031 | Cybersecurity evidence | — | Missing |
| REQ-058 | As-built documentation | SUB-03 § 6 | Passed down |
Reasoning
SUB-01 caps delay damages at 5 % of the order value, the prime contract at 10 %. The difference stays with you.
A supplier reports a delay. An action moves the dates in the schedule, shows which milestones and contract dates shift and drafts the notice to the employer.
More on the platformActions
Delay · Transformer T2, 6 weeks
Years later, at acceptance, the question is who agreed what and when. Engera drafts the evidence from contracts, minutes, mail and tickets, following your template.
More on the platformAcceptance evidence: hall 3
Cable routing
The change was agreed in the site meeting Minutes 0314 and confirmed by mail
Re: cable routing H3. The cable schedule
Cable schedule.xlsx matches drawing
E-H3-102 rev D, and one open item remains, tracked as
H3-142.
The six open electrical items mostly concern the
Working for 2 min
Tell us where things get stuck. We listen, and show you in a demo how Engera takes on exactly that task.
Discuss your use case
Your task
As soon as one trade slips, we lose track of which interfaces …
Discuss your use caseEngera runs in the EU, and your data never trains models. What you store in Engera stays yours: encrypted, with access controlled at organisation, project and individual level.
Much of it never needs uploading at all. Engera is a layer across your systems, not a replacement for your document management, ERP or PLM. It reads where your data lives and starts processes right inside those systems. Only what belongs in Engera ends up there.
Yes. Documents are read section by section. Requirements and obligations land in a register with the source for each one, so nothing has to be read twice.
No. Schedules, contracts and documents stay in your systems. Engera reads them, connects them and writes back only what you approve.
Access is controlled per organisation, project and person, so each team sees only the projects it belongs to.
Tell us, and in the demo we show you how Engera helps with it.