ENGERA
InsightsSecurity
Log inBook a demo
InsightsSecurityLog in
ENGERA

Make AI work in engineering projects.

Platform

  • Overview
  • Analyst
  • Actions
  • Editor
  • Planner
  • Documents
  • Wiki
  • Memory
  • Registers
  • Skills
  • Connectors

Industries

  • Machinery
  • Shipbuilding
  • Large projects
  • Engineering services

Implementation

  • Our approach
  • Pilot and rollout
  • Team enablement

Company

  • About
  • Careers
  • Partners
  • Insights
  • Security
  • Platform
  • Industries
  • Implementation
  • Insights
  • Security
  • About
  • Careers
  • Partners
© 2026 EngeraImprintPrivacyStatus
deen

Large projects / Low volume, high complexity

Keep contracts, schedules and evidence in step across every party.

Book a demo
A bridge with yellow pylons and stay cables, seen from the roadway.

The methods are known. What fails is applying them at scale.

A large project is an interplay: trades, disciplines and companies that depend on one another for years. What is decided in electrical design affects civil works, building services and the schedule, and hardly anyone sees all the connections at once.

No single step is the problem. Every experienced team knows how to check a clause, trace a change or agree an interface. What makes it hard is the volume, the number of parties and the scale, so under cost and schedule pressure, work everyone knows should be done is left undone. AI makes exactly that affordable: every clause read, every change traced, every delay played through the schedule.

And it lifts the baseline of every individual. Someone in electrical design understands faster what a change means for civil works or procurement, without first asking three departments.

92 %of megaprojects run over budget, over schedule or bothFlyvbjerg & Gardner, 2023
33 %of large plant builders use generative AI across the company, though 59 % use it somewhereVDMA AGAB & Strategy&, 2025
≈ 5 %of project cost goes into rework on siteConstruction Industry Institute via ENR

Where Engera helps, from tender to acceptance.

Read a tender with thousands of pages

Upload the tender documents. Engera extracts every requirement and obligation into a register you can assign, filter and track.

More on the platform
Tender Vol. 1 – Contract.pdfPDFTender Vol. 3 – Technical.pdf10% · UploadingEmployer's requirements.pdfPDF

Extract every obligation and technical requirement into the requirements register and assign each one to a discipline.

+Project filesStandard

See which obligations the subcontracts don't cover

Prime contract and subcontracts side by side: for every obligation, whether it was passed down in full, in part or not at all.

More on the platform

Flow-down · Prime contract and subcontracts

IDObligationSubcontractStatus
REQ-012Warranty 24 monthsSUB-02 § 9Passed down
REQ-044Delay damagesSUB-01 § 12In part
REQ-031Cybersecurity evidence—Missing
REQ-058As-built documentationSUB-03 § 6Passed down

Reasoning

SUB-01 caps delay damages at 5 % of the order value, the prime contract at 10 %. The difference stays with you.

Play a delay through the master schedule

A supplier reports a delay. An action moves the dates in the schedule, shows which milestones and contract dates shift and drafts the notice to the employer.

More on the platform

Actions

Delay · Transformer T2, 6 weeks

RunningStarted 10:36 · Anna Keller

  1. Read the supplier's notice
  2. Moved 14 tasks in the master schedule
  3. Checking contract milestones
  4. Draft the notice to the employer

Have the evidence ready at acceptance

Years later, at acceptance, the question is who agreed what and when. Engera drafts the evidence from contracts, minutes, mail and tickets, following your template.

More on the platform

Editor · Hall 3Analyst writing · section 2 of 3

Acceptance evidence: hall 3

Cable routing

The change was agreed in the site meeting Minutes 0314 and confirmed by mail Re: cable routing H3. The cable schedule Cable schedule.xlsx matches drawing E-H3-102 rev D, and one open item remains, tracked as H3-142.

Open acceptance items by trade
Electrical6
Mechanical3
HVAC2
Civil1

The six open electrical items mostly concern the Analyst

DOCAcceptance evidence.docxTemplate · DOCX
Acceptance evidence for hall 3, following the attached template.

Working for 2 min

What's on your mind?+Standard

Your use case is not on the list?

Tell us where things get stuck. We listen, and show you in a demo how Engera takes on exactly that task.

Discuss your use case

Your task

As soon as one trade slips, we lose track of which interfaces …

+Discuss your use case

Explore further

AnalystAsk questions across all your documents and systems.→Agentic ActionsLet recurring work run as a defined process.→ConnectorsConnect the systems your projects already run on.→Our approachFrom the first conversation through the pilot to the rollout.→

FAQ

Engera runs in the EU, and your data never trains models. What you store in Engera stays yours: encrypted, with access controlled at organisation, project and individual level.

Much of it never needs uploading at all. Engera is a layer across your systems, not a replacement for your document management, ERP or PLM. It reads where your data lives and starts processes right inside those systems. Only what belongs in Engera ends up there.

Yes. Documents are read section by section. Requirements and obligations land in a register with the source for each one, so nothing has to be read twice.

No. Schedules, contracts and documents stay in your systems. Engera reads them, connects them and writes back only what you approve.

Access is controlled per organisation, project and person, so each team sees only the projects it belongs to.