ENGERA
InsightsSecurity
Log inBook a demo
InsightsSecurityLog in
ENGERA

Make AI work in engineering projects.

Platform

  • Overview
  • Analyst
  • Actions
  • Editor
  • Planner
  • Documents
  • Wiki
  • Memory
  • Registers
  • Skills
  • Connectors

Industries

  • Machinery
  • Shipbuilding
  • Large projects
  • Engineering services

Implementation

  • Our approach
  • Pilot and rollout
  • Team enablement

Company

  • About
  • Careers
  • Partners
  • Insights
  • Security
  • Platform
  • Industries
  • Implementation
  • Insights
  • Security
  • About
  • Careers
  • Partners
© 2026 EngeraImprintPrivacyStatus
deen

Platform / Documents

Documents Engera has actually read.

Drop in what you have: contracts, specifications, data sheets, standards, presentations, scans. Engera reads every page, recognises headings, tables and figures and structures the document into sections.

Book a demo
TitleDocument type
PDFStatement_of_Work_V12Statement of work
XLSCriteria catalogueEvaluation matrix
DOCProject handbookHandbook
PDFRequest for proposalTender
PPTKick-off presentationPresentation

SRC-001

Statement_of_Work_V12.pdf

Outline

  • 1 Summary3
  • 2 Key points63
  • 3 Scope of supply: satellites38
  • 3.1 Orbit parameters8
  • 4 Scope of supply: platform510
  • 5 Licence terms16
  • 7 Exit scenarios626

Read first, then answer. Page by page, section by section.

Every document is read in full on upload, scanned pages included. Engera recognises the type of document, summarises it and builds the outline you find in the document itself.

These sections are the basis for everything else: the Analyst opens exactly the ones it needs, Actions work through them, and every statement points to the passage it came from.

Every format your project uses

PDF, Word, Excel and PowerPoint, scans and drawings, from folders or straight from SharePoint. You organise them in folders as usual.

DOC
XLS
PPT
PDF
ENGERA

Every statement with its passage

Engera remembers where each text block sits on the page. One click on a source opens the document right there, highlighted.

PDFStatement_of_Work_V12.pdfPage 10 of 32

4.2 Platform availability

The platform shall be provided around the clock in regular operation.

Availability shall be at least 99.5 % as an annual average, measured at the interface to the client.

Planned maintenance windows shall be announced four weeks in advance.

Outages longer than four hours shall be reported without delay.

At least 99.5 % availability as an annual average is required. PDFStatement of work p. 10

Linked, not just filed

Sections are linked to the requirements, register entries and wiki pages that rely on them. From any passage, you see where it is used.

North pumping stationProject knowledge
PDFTechnical specification.pdf
DOCAcceptance plan.docx
XLSOperating data.xlsx
3 Operating conditions
PDFTechnical specification.pdf
Section 3.2 · Page 12

3.2 Operating pressure

The maximum permitted operating pressure of the pumping station is 6 bar. Compliance must be demonstrated at acceptance.

Table 3 · Operating limits
Operating stateLimitEvidence
Continuous operation≤ 6 barPressure measurement
RISK

Pressure peaks during load changes

Operating data.xlsx · Test series 07

What teams use it for

Tender documentsDozens of documents opened up in an hour.→Standards and class rulesThe right passage, not just the right file.→Contract setContract, annexes and amendments as one body of documents.→

Works well with

Platform overview
AnalystAsk across all documents and systems, get answers with sources.→RegistersRequirements, risks, open items: lists with a source.→ConnectorsConnect the systems your projects already run on.→

Which task would you
most like to hand off?

Tell us, and in the demo we show you how Engera takes it on.

Book a demoSee Engera in action